Jhirk Mullah Katiyar Link Bridge
Project Mode Project Cost Revised Amount |
Public Private Partnership 3414 Millions 3674 Millions |
Location | Over River IndusConnecting Thatta District with Tando Muhammad Khan |
Construction Period | 3 Years |
Project Status | Work completed |
Project Background:
There is no any bridge over River Indus between Kotri & Thatta. The Peoples of Badin, Tando Muhammad Khan, Sajawal and Mirpur Bathoro are facing presently problem to reach their destination. They use either bridge at Kotri or have a long journey and use the Thatta Sajawal Bridge. Government of Sindh have initiated the Project to save the time of Area Peoples and also intends to connect N-5 (National Highway) with Super Highway by extending the JMK Bridge approach roads through Jhimpir Railway Station.
Project Scope | Details |
---|---|
Construction of Main Bridge Structure | The main bridge structure will be 1700 meters in length and will have 34 spans Each bridge span will be 50 meter in length No. of Piles are 70 No. of Girder are 136 |
Small Bridges | Bridge over RBOD Bridge over Pinyari Canal Bridge over Sam Nalla |
RCC Culverts | 5 Nos. RCC culverts with 2 to 3 cells |
Pipe Culverts | 55 RCC Pipe culverts |